Your steel, priced on its real emissions. Not on EU default values.
Ferrologic Analytics captures production emissions straight from your weighbridge and power meters, and turns them into the verified data your EU buyers need — before they price your shipment on Brussels' assumptions.
Request a 15-Minute Technical Architecture DemoREAD-ONLY AT YOUR GATE
Docker-based capture that never writes to plant systems.
BUILT FOR VERIFICATION
A number built from locked measurements can defend itself; a retyped spreadsheet cannot.
Live weighbridge feed, Scope 1 & 2 intensity per ton, one-click registry-ready export.
The EU Carbon Border Adjustment Mechanism
An EU regulation that prices the carbon emissions of imported goods, including iron, steel and aluminium.
THE EU IMPORTER
Files declarations in the CBAM registry. The legal obligation and all penalties sit on the EU importer.
YOUR PLANT
May voluntarily upload verified emissions data to the registry for importers to use instead of default values.
WHAT IT PRICES
Embedded emissions: the greenhouse gases caused by making the goods.
WHEN DATA IS MISSING
When an importer cannot present actual, verified emissions data, the EU applies default values plus a mark-up: 10% in 2026, 20% in 2027, 30% from 2028.
Implementing Regulation (EU) 2025/2621
The truck scale at your factory gate.
It weighs the material coming into and leaving your plant. This platform connects to it and reads those weights.
One load, gate to registry
At the gate
The load crosses your weighbridge. The reading is locked at the instrument — OIML R-76.
In the engine
The platform computes that load's Scope 1 & 2 intensity per ton. Nobody retypes anything.
On your buyer's desk
Your EU buyer files your verified number instead of the default.
What changed on 1 January 2026
+10%
The mark-up added to default emission values in 2026. Rises to 20% in 2027.
Implementing Regulation (EU) 2025/2621
+30%
The mark-up from 2028. Unverified data gets more expensive every year.
Implementing Regulation (EU) 2025/2621
5%
The materiality threshold your emissions data must survive at verification.
Implementing Regulation (EU) 2025/2546, Art. 5(1)
When your buyer cannot file verified actuals, the EU assigns your country's average emissions plus the mark-up — and that cost lands on their invoice, then on your negotiation.
Default values vs. your actuals
WITHOUT VERIFIED DATA
Your buyer files EU default values: India's average emission intensity for your product route, plus the annual mark-up. Your steel carries a competitor-average carbon bill, however clean your plant runs.
WITH WEIGHBRIDGE ACTUALS
Your buyer files your measured Scope 1 & 2 intensity, calculated from calibrated instruments at your gate. Your number, defensible at verification — not an assumption.
How it works
Connect.
Read-only, Docker-based integration at your weighbridge and power meters. It ingests readings; it never writes to plant systems.
Compute.
Scope 1 & 2 carbon intensity per ton of metal, classified by HSN/CN code, calculated continuously — no operator enters anything.
Report.
Audit-ready CBAM reports and registry-ready data exports your EU buyer can use instead of defaults.
The pipeline
IN
- Weighbridge readings (OIML R-76 calibration lock)
- Power meter telemetry
- No manual entry
ENGINE
- Scope 1 & 2 intensity per ton
- HSN/CN tariff classification (7308 structural steel, 7318 fasteners, 7604 aluminium profiles)
- Continuous calculation
OUT
- Audit-ready CBAM report
- Registry-ready data export
- Executive compliance dashboard
Why spreadsheets keep failing
Manual spreadsheets
No calibration lock, human error, and a 5% materiality threshold waiting at verification.
Consultants
Recurring advisory fees for numbers that still start from manual data entry.
Generic ESG platforms
Built for corporate reporting, not for a weighbridge at a smelter gate.
The data your buyer needs already exists — your weighbridge weighs every load. Ferrologic Analytics just refuses to let it be retyped.
[SCREENSHOT: audit-ready CBAM report page — owner provides]
The integration path
Survey
Weighbridge model, meters, network.
Install
An isolated, read-only Docker container at the plant edge.
Verify
Feeds stream in; the calibration lock is checked end to end.
Report
The first audit-ready CBAM report generates from live readings.
File
Your buyer receives a registry-ready export.
No step asks an operator to type a number.
Built in India, built for how Indian plants run
Secondary steel smelters and aluminium extruders do not run on clean ERP exports. They run on weighbridges, power meters and shift registers. That is the world this platform is built for.
More about the methodology →See the architecture. Judge it yourself.
Fifteen minutes, one screen share, no operational claims — the software and how it connects.
Request a 15-Minute Technical Architecture Demo